Routine Maintenance of Port Physical Facilities Project 2022 Package 1: (1) Repair and Repainting of GI Chains, Shackles and Accessories; (2) Retrieval of one (1) unit Rubber Dock Fender, Port of General Santos, Makar Wharf, General Santos City
ENGINEERING SERVICES DIVISION ACTIVITIES:

March 29, 2023: Final Inspection Conducted by Engineering Services Division (ESD) together with the Inspectorate Team and  COA Resident Auditor Ms. Jyriel Y. Pastillero for the Project: “Routine Maintenance of Port Physical Facilities Project 2022: Package 1” at the Baseport, General Santos City

March 08, 2023: Private Ports Inspection Conducted by Engineering Services Division (ESD) at Petron Oil Depot, Bawing, General Santos City. This is to concur the Certificate of Structural Stability of the said Facility.

MONTHLY INSPECTION OF PORTS UNDER PPA PMO-SOCSARGEN:

January 16-18, 2023: Monthly Inspection of Port Physical Facilities under PMO-SOCSARGEN: Port of Glan, Port of San Roque and Port of Kalamansig

February 22-24, 2023: Monthly Inspection of Port Physical Facilities under PMO-SOCSARGEN: Port of Glan, Port of San Roque and Port of Kalamansig

March 22-24, 2023: Monthly Inspection of Port Physical Facilities under PMO-SOCSARGEN: Port of Glan, Port of San Roque and Port of Kalamansig

April 18-20, 2023: Monthly Inspection of Port Physical Facilities under PMO-SOCSARGEN: Port of Glan, Port of San Roque and Port of Kalamansig

May 22-24, 2023: Monthly Inspection of Port Physical Facilities under PMO-SOCSARGEN: Port of Glan, Port of San Roque and Port of Kalamansig

June 20-27, 2023: Monthly Inspection of Port Physical Facilities under PMO-SOCSARGEN: Port of Glan, Port of San Roque and Port of Kalamansig and Port of Mabila